What we fit, in detail

Four kinds of finish joinery, all measured on site and quoted in writing.

Program 01 · The whole assembly matters

Doors & fire doors

A fire door is a system, not a slab. The leaf, frame, intumescent strips, smoke seals, hinges, closer and the gap around the leaf all form part of the certification, and we will not substitute ironmongery or leave out a closer because a client prefers the look. The certification evidence goes to you on completion.

  • Per door
  • Homes, landlords, managing agents
  • Written quote
  • Correct door set

Start this program

Stage 1 · What is required

Rating, and whether a closer is needed.

Stage 2 · Door set

Specified complete, not assembled ad hoc.

Stage 3 · Fit

To the manufacturer's tolerances.

Stage 4 · Handover

Certification evidence for your records.

Stage 1 · Sample

A short offcut of the existing profile.

Stage 2 · Match

Copied, or cutters ground.

Stage 3 · Fit

Scribed to walls that are not straight.

Stage 4 · Finish

Filled and ready for decoration.

Program 02 · Matched to what exists

Skirting, architrave & trim

In a Victorian or Edwardian house the difficulty is matching a profile that has not been made commercially for a century. We can have cutters ground to copy an existing section so a repair or an extension does not announce itself with a slightly wrong moulding.

  • 1 to 5 days
  • Homes
  • Written quote
  • A sample length

Start this program

Program 03 · Part K is dimensional

Staircases & balustrades

Part K sets rise and going, headroom, handrail heights and the guarding rule that a 100 mm sphere must not pass through any gap — which rules out a great many spindle spacings people like the look of. We build to those figures and will refuse a design that fails them.

  • 2 to 6 days
  • Homes
  • Written quote
  • Building control where notifiable

Start this program

Stage 1 · Survey

Rise, going and headroom measured.

Stage 2 · Design

To Part K, not to preference.

Stage 3 · Install

Fixed and checked for movement.

Stage 4 · Guarding

100 mm sphere rule verified.

Stage 1 · Check the room

Floor level, walls, services.

Stage 2 · Level carcasses

Before anything is fixed.

Stage 3 · Scribe

Panels and cornice to the walls.

Stage 4 · Other trades

Gas and electrics referred out.

Program 04 · Levelled, then scribed

Kitchen & wardrobe fitting

Flat-pack kitchens assume square rooms and level floors, which London houses rarely provide. The work is in levelling the carcasses and scribing the end panels and cornice so the finished run looks built-in. Gas and notifiable electrical work goes to registered trades.

  • 3 to 10 days
  • Homes
  • Written quote
  • Units on site

Start this program

Got doors or stairs to fit?

A free measured quote, with the fire rating and regulations confirmed first.